What a spell of weather we have just had ! The perfect weather helped us do the perfect job. The turf was stripped then the sub base was laser graded and a key was done ready to except the new loam. 82 cubic M of loam was used to construct a 100mm profile. This was done to allow for the long term development of the cricket club.